DYP OPS VOICE

Design Your Price - field prototype DRAFT v0.13

Toolbox, on site / off site

Per JOB, not per day. Crews move between jobs all day. Do the On Site check at every job walk-up, even if it is three things: materials on site, what we are doing, how long we plan to be here. Do the Off Site check when you finish and leave that job.

On Site, job walk-up

Defects, incomplete work, anything that will need fixing.

Film everything sitting on site. This is the record of what was actually delivered.

Circle an item in the materials video or a photo, then say where it goes.